How It Works

How We Convert Your Excavator into an Autonomous Machine

A non-invasive retrofit that transforms your existing equipment into production-grade autonomous machines. 2-3 days. No permanent modifications. Full control flexibility.

The Retrofit Process

From assessment to production deployment in under a week. Our retrofit kit installs on your existing equipment without permanent modifications.

1

Assessment

We evaluate your machine, site conditions, and operational requirements to design the optimal retrofit configuration.

2

Kit Installation

Our technicians mount the sensor array, compute unit, and communication hardware. 2-3 days per machine.

3

Calibration

Each machine is calibrated to its specific characteristics — hydraulics response, arm geometry, and operational envelope.

4

Operator Training

Your team learns to use the fleet control dashboard, interpret system status, and manage autonomous operations.

5

Production Deployment

Go live with full support. Our team remains available for optimization and ongoing support.

AI Vision System

What the Machine Sees

Four sensor types work together to create a complete understanding of the work environment — terrain, obstacles, and operational boundaries.

LiDAR

360° terrain mapping with millimeter precision. Works in any lighting conditions including complete darkness.

Stereo Cameras

Depth perception and object classification. Identifies workers, vehicles, and obstacles in real-time.

GNSS Positioning

RTK-corrected GPS for centimeter-level positioning. Accurate grading and excavation without manual staking.

IMU

Inertial measurement for precise bucket position and orientation. Compensates for machine tilt and movement.

Fail-Safe Design

The AI processes sensor data 30 times per second. If any sensor detects an anomaly or obstacle, the machine stops immediately. Safety is never compromised for productivity.

Fleet Control

Multi-Machine Fleet Control Dashboard

One operator supervises 3-4 autonomous excavators from a tablet interface. The AI handles path planning and obstacle avoidance. The operator monitors status, sets priorities, and intervenes when needed.

Real-Time Status

See every machine: position, task progress, fuel, and alerts.

Task Assignment

Assign work zones and priorities. The AI optimizes execution paths.

Remote Intervention

Take control of any machine instantly. Switch between autonomous and manual.

Performance Analytics

Track productivity, fuel consumption, and utilization metrics.

Fleet Dashboard
EX-1Active

Task 70% complete

EX-2Active

Task 80% complete

EX-3Active

Task 90% complete

EX-4Active

Task 100% complete

OEM Compatibility Matrix

CHINOU's retrofit kit is OEM-agnostic. We work with the equipment you already own.

ManufacturerSize ClassStatus
CAT6-ton to 50-tonCompatible
Komatsu6-ton to 50-tonCompatible
John Deere6-ton to 50-tonCompatible
Hitachi6-ton to 50-tonCompatible
OthersVariesContact Us

Installation Timeline

From hardware mount to production-ready in 3 days per machine.

Day 1

Hardware Mount + Sensor Install

  • Mount sensor array on cab and boom
  • Install compute unit in protected enclosure
  • Connect power and communication cables
  • Verify hardware connectivity

Day 2

Software Config + Calibration

  • Configure AI vision system
  • Calibrate hydraulics response curves
  • Map operational boundaries
  • Set safety parameters

Day 3

Testing + Operator Training

  • Execute test sequences
  • Verify obstacle detection and avoidance
  • Train operators on fleet dashboard
  • Production sign-off

Frequently Asked Questions

How long does the retrofit installation take?+
Typical installation takes 2-3 days per machine. No permanent modifications to the excavator are required.
What excavator models are compatible?+
CHINOU's kit works with CAT, Komatsu, John Deere, Hitachi, and other major OEM excavators from 6-ton to 50-ton class.
Does the retrofit void my equipment warranty?+
The CHINOU kit is non-invasive and does not modify core machine systems. Consult your dealer for specific warranty details.
What sensors are included in the kit?+
The kit includes LiDAR, stereo cameras, GNSS positioning, IMU, and our proprietary AI vision system for real-time obstacle detection.
Can I switch between autonomous and manual operation?+
Yes. Operators can toggle between fully autonomous, semi-autonomous, and full manual control at any time.
What connectivity does the system require?+
The system operates with standard cellular connectivity. Offline operation is supported for remote sites.
How does multi-machine control work?+
One operator monitors 3-4 machines via a tablet interface. The AI handles real-time path planning and obstacle avoidance. The operator supervises and intervenes when needed.
What happens if the system detects an obstacle?+
The AI vision system stops the machine immediately and alerts the operator. Safety is the top priority — the system fails safe.

See It In Action

Schedule a demo or start a pilot program with your equipment.

Request a Pilot